1/11/06 - Wednesday
Sorry, no pictures today. In fact, there isn't a whole lot to report this week. Kevin has been working on installing the plumbing system. That's pretty much it. Well, plumbing and electrical. The specifics aren't too exciting. My conversations with Kevin over dinner this week have consisted of:
A: "So what did you do today?"
K: "Worked on the plumbing."
A: "How did that go?"
K: "I made progress, but I ran out of (fill in a size) elbows, and I have a bunch of extra (fill in another size) elbows, and I ran out of (fill in a size) pipe. I have to go to Home Depot tomorrow"
A: "oh" (I feel bad. It must be slow and tedious to work by yourself on a project such as this.)
Yup. The next horizon is being ready for the drywall. Guestimated timeline for this is T- two weeks. For those following along out there in bloggy land, I'll try to get some pictures posted soon, which will make this phase of our home construction marginally more interesting:)
|
Return to Main Page
Comments
THANK-YOU for the Plumbing UP-DATE :-)
THANK-YOU for the Plunbing UP-DATE :-)
|